Showcase 3:  Photovoltaic Project on Rooftop for an Industrial Building

In this project, we used commercial and industrial distributed photovoltaic system with 370W polycrystalline modules, Huawei multi-MPPT inverters, and an array-type design. The installed capacity for the building is 931KW for self-consumption with excess electricity fed into the grid. 

 

The first-year electricity generation is 1.241 million kWh, with an effective generation duration of 1333 hours. 

Energy Efficiency: 195.24kW

Estimated Savings: 15% off electricity bill

Expected Recovery of Cost: 4.2 years